Bolt check all connections throughout the switchboard to the required torque setting and
paint to give a visual indication that the connections have been checked
Testing as detailed under our Testing & Commissioning documents
Check Incoming & Outgoing devices for correct operation and continuity
Inspection of ARC shoots with the Air Circuit Breaker
Prove the Trip unit within the ACB functions correctly
Check that the changeover system whether Electrical, Mechanical or both functions
correctly
Check the Metering is set up correctly, and functions correctly
Replace / Fit Danger labels and Phase labels where required
Clean Switchboard inside and out
Thermo graphic surveying
Harmonic Analysis and Mains Monitoring
We have all the necessary portable equipment for on site maintenance and servicing of
devices