Delivery & Off-loading of Switchboards via HIAB Mounted Vehicles
Sitting & Positioning of LV Switchboards
Re-bolting split sections together once they are in positions
Re-connecting of Internal Wiring
Flash testing
Meggar Testing
Modifications & Installation of:
ACB’s Fitted or upgraded
MCCB’s Fitted or upgraded
Fuse Switches fitted or upgraded
Metering Installed or upgraded including CT’s
Electronic Surge Protection
Converting manual changeovers to automatic controls
Standard Controls
Motorising devices such as MCCB’s / ACB’s. (For load shedding purposes etc)
Power Factor Correction
Switch Board Extensions
Replacing obsolete or malfunctioning MCCB’s / ACB’s / Fuse switches
Sheet Metal work / Copper work modifications manufactured to suit any of the above
switch replacements that are not a straight replacement or additional coppers to assist
in cabling of the switches